|
|
|||||||
Aboveground Storage Tanks
|
This project included the removal of remaining product and residuals from four large #6 fuel oil aboveground storage tanks and associated piping. Approximately 900 linear feet of trench excavation which consisted of live steam, fuel oil supply and return lines. Additional work included the decontamination, demolition and removal of four 50,000 barrel aboveground #6 fuel oil storage tanks, excavation,transportation disposal of 3,000 cubic yards of petroleum contaminated soil, backfill and site restoration activities.
| |
|
|
| | ||
(c) RSI 2007. All rights reserved.